Asphalt Plant — Setup
هذا المحتوى غير متوفر بلغتك بعد.
Before recording any weighments or batches, set up the plant’s masters.
Asphalt Plant
Section titled “Asphalt Plant”One record per physical plant: company, rated capacity (tph), bitumen tank, default fuel item, and a status (Running / Idle / Breakdown) that the plant status log keeps in sync.
Asphalt Silo
Section titled “Asphalt Silo”One silo = one Bravo Inventory warehouse. The silo’s stock level is that warehouse’s Bin balance — there is no separate silo quantity to reconcile. Set a low-level threshold percentage per silo to get an alert when stock runs low.
Haul Vehicle
Section titled “Haul Vehicle”Plate number, driver, tare weight, load capacity (tons), and whether the vehicle is company-owned or a contractor’s (with the transporter linked). The plate number is the vehicle’s own record name, so it can be looked up directly by plate on the weighbridge.
Project Site
Section titled “Project Site”The customer’s delivery destination: address, distance from the plant, and a site contact — referenced by supply contracts and delivery tickets.
Asphalt Settings
Section titled “Asphalt Settings”A single settings record holding:
- Default silo/finished-goods warehouses, and a default reject warehouse for batches that fail quality
- The bitumen item
- Naming series for Weighment, Asphalt Batch, and Delivery Ticket
- Over-delivery tolerance percentage for contract balance checks
- Mix temperature window (min/max °C) for the batch submit guard
- Low-silo stock alert threshold
Asphalt Mix Design
Section titled “Asphalt Mix Design”The recipe: a percentage of each raw material (including RAP — reclaimed asphalt pavement — where used) that must sum to exactly 100%. A mix design can only be used in production once it is submitted and marked Approved.