Manufacturing Settings

هذا المحتوى غير متوفر بلغتك بعد.

Manufacturing settings in Bravo Hub ERP configure production workflows, manage bill of materials (BOM), track work orders, and oversee inventory to streamline operations and ensure efficient production management.

Home > Manufacturing > Settings > Manufacturing Settings

Screenshot 2024-08-29 at 3.28.09 PM

If enabled, materials can be consumed without immediately manufacturing finished goods in a single Work Order. This is useful if one or more time consuming products are being manufactured.

For example a single product takes a month to manufacture and the raw materials are consumed daily. In a regular scenario, this won’t be feasible with stock entries. Enabling this option will allow you to create stock entries for Material Consumption without having to create an entry to backflush. End result is that you can see the stock being consumed in the Warehouses and can update the final manufacture entry for finished goods at a later stage.

The method selected here will be chosen for backflushing raw materials : 1. Material Transferred for Manufacture 2. BOM

3. Validate Components and Quantities Per BOM

Section titled “3. Validate Components and Quantities Per BOM”

Note: This feature will be available from the version V15

If “Backflush Raw Materials Based On” as BOM, then users can validate component quantity according to BOM. To do that they have to enable “Validate Components Quantities Per BOM” checkbox in the “Manufacturing Settings”.

If user has changed the quantity in the “Material Transfer for Manufacture” or “Manufacture” stock entry, then system will throw the below error

component-qty-validation

If user has removed the item in the “Material Transfer for Manufacture” or “Manufacture” stock entry, then system will throw the below error

4. Get Raw Materials Cost from Consumption Entry

Section titled “4. Get Raw Materials Cost from Consumption Entry”

If the ‘Allow Continuous Material Consumption’ is enabled then user can see the option ‘Get Raw Materials Cost from Consumption Entry’.

The ‘Get Raw Materials Cost from Consumption Entry’, determines whether the cost of raw materials used in production should be automatically derived from the consumption entries recorded during the manufacturing process. When enabled, Bravo Hub ERP calculates the cost based on the actual materials consumed, ensuring accurate cost tracking and financial reporting.

Capacity planning is the process in which an organisation decides whether or not to accept the new orders based on the resources and existing work orders.

Screenshot 2024-08-29 at 3.30.52 PM

If checked, capacity planning won’t be done. Enabling it will help to decide whether or not to accept the new orders based on the resources and existing work orders.

If enabled it’ll allow creating work orders, job cards etc. outside workstation working hours.

If enabled, it’ll allow production activities even on those days that are marked as holidays as per the Holiday List of the organisation.

The number of days specified here means the number of days in advance when the capacity planning activities will be initiated for production.

This specifies the time span that should be kept between two operations in minutes.

Screenshot 2024-08-29 at 3.32.55 PM

This Warehouse will be auto-updated in the ‘Work In Progress’ Warehouse field of Work Orders.

This Warehouse will be auto-updated in the ‘Target Warehouse’ field of Work Order.

This Warehouse will be auto-updated in the ‘Scrap Warehouse’ field of Work Order.

Screenshot 2024-08-29 at 3.36.10 PM

1. Overproduction Percentage For Sales Order

Section titled “1. Overproduction Percentage For Sales Order”

It allows you to specify a percentage by which production can exceed the sales order quantity.

2. Overproduction Percentage For Work Order

Section titled “2. Overproduction Percentage For Work Order”

It defines the allowable percentage by which the actual production quantity can exceed the planned quantity specified in a work order.

Screenshot 2024-08-29 at 3.38.32 PM

1. Add Corrective Operation Cost in Finished Good Valuation

Section titled “1. Add Corrective Operation Cost in Finished Good Valuation”

If enabled then the cost for a corrective operation type will also be included while calculating finished goods valuation

If enabled, the Material Transfer button will be visible and will allow you to transfer raw materials even if after the raw material requirement is fulfilled against a Job Card.

This is particularly useful in cases where the transferred raw materials are damaged and additional raw materials need to be transferred to produce the same amount of finished goods as intended.

Screenshot 2024-08-29 at 3.39.41 PM

If ticked, the BOM cost will be automatically updated based on Valuation Rate / Price List Rate / last purchase rate of raw materials.

2. Set Operating Cost / Scrape Items From Sub-assemblies

Section titled “2. Set Operating Cost / Scrape Items From Sub-assemblies”

In the case of ‘Use Multi-Level BOM’ in a work order, if the user wishes to add sub-assembly costs to Finished Goods items without using a job card as well the scrap items, then this option needs to be enable.

If checked, system will automatically create the serial numbers / batches for finished goods on submission of Work Order

4. Allow Editing of Items and Quantities in Work Order

Section titled “4. Allow Editing of Items and Quantities in Work Order”

If enabled, the system will allow users to edit the raw materials and their quantities in the Work Order. The system will not reset the quantities as per the BOM, if the user has changed them in the work order materials table.