Asset Maintenance Log

Imagine a technician completes the monthly inspection of a Nova Industries packaging machine. The schedule says the work was due, but the company still needs proof of what was done, when it was completed, and whether the machine had a problem.

An Asset Maintenance Log records the actual maintenance event. It turns a planned task into a dated service history that the operations and audit teams can check later.

Use the Maintenance Log section of the Asset Maintenance record or open the Asset Maintenance Log list.

Planned Asset Maintenance Logs in Bravo Hub ERP

  1. Confirm the Asset, task, due date, and assignee.
  2. Change status to Completed after the work is actually finished.
  3. Enter the completion date and actions performed.
  4. Attach the certificate when the task requires one.
  5. Save the log and review the next due date on the maintenance plan.

Maintenance plan linked to its recurring logs

FieldWhat it means
PlannedWork is scheduled but not complete.
CompletedWork and required evidence have been recorded.
OverdueThe due date passed without completion.
CancelledThe occurrence will not be performed and the reason should be clear.

Check required completion date, certificate, and actions fields for the task.

Review the parent maintenance task’s periodicity and the last completion date.

Scheduled plans normally create them. Manual logs can be used for exceptional maintenance when the relationship remains clear.

Follow the document’s edit rules and retain audit history. Do not overwrite evidence casually.

In Bravo Hub ERP, no. It is an operational record. Repair invoices or capitalized repair costs create accounting effects.