Asphalt Plant — Weighbridge
Every truck in or out of the plant is weighed. A Weighment record holds the direction (Inward/Outward), the vehicle, gross and tare weight, and the net weight (computed, read-only) as gross minus tare.
Inward weighments
Section titled “Inward weighments”Used when raw material arrives. The item being received is required. If the weighment is linked to a Purchase Order, submitting it automatically creates a Purchase Receipt into that item’s silo warehouse — the plant’s stock is updated the moment the truck is weighed, not later at data entry.
Outward weighments
Section titled “Outward weighments”Used when a finished load leaves the plant. An outward weighment is consumed by exactly one Delivery Ticket; once the ticket is submitted, the weighment is marked Completed and locked from being reused by another ticket.
Automated weighbridge indicators
Section titled “Automated weighbridge indicators”Where the weighbridge has an electronic indicator or PLC instead of an operator typing weights into Desk, it can call the weighbridge API directly to record a weighment. The endpoint authenticates with a Bravo API key/secret issued to a dedicated Weighbridge Operator account (not a shared secret parameter), and is idempotent: a duplicate call for the same vehicle, direction, and gross weight within about a minute returns the existing weighment instead of creating a second one, so a flaky serial link or retry logic on the indicator can’t double-book a load.
Guard rails
Section titled “Guard rails”- Gross weight must exceed tare weight.
- A weighment already marked Completed cannot be attached to another Delivery Ticket.